“Flashback Friday”: 2010–A year in Review

January:

My first finish – halfway through January, was “Oh My Lucky Stars”

stars

Closer to the end of the month, I finished the top for the Sweet Treasures Block of the Month.

sweet

February:

Near the beginning of the month, I completed the Neptune top.  It was the only “finish” of the month.

neptune

March:

March didn’t see any finishes.

April:

I made a quick baby quilt for my husband’s boss.

baby

I also finished my Emma’s Legacy top:

100_5167

May:

May saw the completion of “Sent with Love” top for my niece.

DSCF1049

June:

I completed the top “Sent With Love” above, but forgot to take the picture.

July:

Surprise, another no activity month.

August:

After the inactivity, I started simple with some coasters:

DSCF9001_thumb

September:

I quilted and finished my Friendship braid quilt.

112_5239

I made a charm square tote.

DSCF3008

I dyed fabric.

DSCF3018_thumbDSCF3018_thumbDSCF3016_thumb

I completed my “Pumped Pumpkins” quilt.

pumpedpumpkins_thumb

Another charm bag with jelly roll strips instead of charm squares.

DSCF3028_thumb

It seems like September was a flurry of activity!

October:

Dying:

DSCF3191

DSCF3183

DSCF3193_thumb

My Heartland Heritage quilt top.

20100927-HQG-print19

November:

A Pineapple quilt made with the hand-dyes.

DSCF3269

A quick Halloween table topper for next year:

table

The top from the “Simply Sophisticated BOM”

simply

and the quilt for my bed:

emma

December:

A Pink and Purple quilt for my daughter (not quilted here).

pink purple

A bunch of Tiny Treats bags:

114_5255

Some block roll-ups for friends:

114_5265

A case for my neighbor’s Kindle:

114_5389

A very productive year.  This was just the “finishes” and not counting all the projects I started.