• BOM,  In Progress,  In Progress,  Projects

    Christmas Twinkle – Months 4 & 5

    I completed month 4 last month, I just never made a post about it. This quilt is coming along. I really like the red/white quilt and have always wanted to make one. I love the reminder that just because it is only two (predominant) colors, does not mean that it only has to be two fabrics. Month 5 was one that was fairly easy. I rearranged my sewing room so I don’t have access really to my design wall – so I had to use one of the design boards that I purchased. I didn’t choose one that was fairly clean – oops. Do I miss access to my design wall – yes. But I gained more open space in my tiny room to not feel cramped. Almost halfway done with this quilt and I am still wandering how groups of three blocks are going together! Related Images:

  • Goals

    November Goals

    Another busy month. I am going to try and get into my sewing room at least a couple of times during the week before work. I generally wake up at 4 or 5 am and do not have to start work until 7. I work from home, and though the commute from the sewing room is a little longer than the commute from my bedroom. I may have to leave a couple of minutes earlier. 😉 Related Images:

  • Goals

    October Goals – Revisited

    In some ways this was a productive month – I completed one top and quilted two others. In some ways it was not – I did not get to all of my goals. Here is how I did: Related Images: