-
Make it Merry – Month 5
One more month until the end of this BOM. Related Images:
-
Ponte Vecchio – Months 9 & 10
All caught up. I am still wondering where this is going to end up. Related Images:
-
October 2025 Goals
I always feel better when I have goals for the month. I don’t always complete them, but I do work on them diligently when I can. I typically only quilt on the weekends or holidays from work. I am usually just too tired after work to even think about going into my sewing room. I do need to prep a few small things to work on during the week – so if I get up at 3 am and can’t go back to sleep, I go into my sewing room instead of going into work. Related Images:
-
September 2025 Goals Revisited
I got quite a bit done from my todo list for September: Here are the Items I want to work on this month: Not on the list: Acorn Garland Related Images:
-
Ponte Vecchio – Month 8
I forgot to hit publish on this when I finished this post. Oops. These trees are super cute. I can’t wait to finish this block of the month, it is going to be very cute. Related Images:
You must be logged in to post a comment.